Then or during this, our bathrooms will be updated and the master bath finally completed. I plan to install similar temp controlling valves in each bathroom and replace copper pipe with PEX and sharkbite connectors along with pipe insulation over the entire runs.
Additionally, the new cellulose insulation may be added if cost is not too high to the bathroom exterior walls and at least the wall between the bathrooms for sound control.
The biggest hurdle will be rearranging the drain to fit a new shower stall in the master bath since heating and ac ducts lie just below them, making it hard to get to. I would also like to reprogram both shower drain's destinations to a holding tank for use in the toilets and yard and garden irrigation, perhaps lowering my water bill and eventually lowering or easing the increase in our sewer bills.
It all only takes money and time. Time I've got. Money is short. Short for everyone.
Stay tuned, it might be a bumpy ride.....
Russ
No comments:
Post a Comment